Discussion about this post

User's avatar
Bayley's avatar

Big news finishing Cry Wolf! I should reread this series. I love the little run down of Mel activities!

Kathleen Van De Wille's avatar

I consider Buffy and Angel to basically be constitutive texts of everything that is me. I teared up a bit watching you talk about the finale, which I still consider one of the best things ever put on television. I'd love to hear you talk more about both shows and will probably get a little sniffly if you do (maybe something on identity and love re: Illyria etc.?)

No posts

Ready for more?